The task is to build a new bridge on the Sunshine trail. What we need is 3 people for Friday afternoon/evening to transport materials from the DNR storage area, aka "water cooler", to trailhead.
Saturday and Sunday we need 15-20 people for each day. We need to be sure that we have enough to get the job done. If the bridge is not finished by the end of the day on Sunday, the trail will be closed until the bridge IS completed.
Please email me at [email protected] or call my cell at (253) 318-8188. I need to get a list of people that are confirmed for this project.
Dale