• Help Support Hardline Crawlers :

Reply to thread

Which goes back to the money thing I mentioned.  And even if I go in with my engineer, their engineer could still say no, it's not my land to make the call on.


As for moving it, it was moveable, especially if you partially disassembled it.  no wide moving issues then and it could have been done with a JD 160LC and a 40' flat bed.  There was even a path to get out. The dissaembly work could have been done before even renting anything too.


It wasn't looking like a walk in the park, but it was definately doable.


100 Words
Back
Top