It would be done if Frog & Randall wasn't so big, it's hard for a 130 lb super man to push people around that out weigh him. I been sending Labron a dollar a week since January so I'm sure he has put it to good use.
no really, here's the deal
I think their rigs are going to powder coat maybe this week so he should be able to get a bunch done on mine till they get back. He needs to stay focus on the rig he is building at the time, so if he is working on Randall rig that's all he needs to think about, or that's how I'd like mine done anyway. most every thing is bought and in, I'll have to machine my four link bars when he give me the size, but other than just a few things I need to buy he should be able to build it up to powder coat & paint.
I'll still like all the plumbing stuff and I'm trying to make my mind up on what I want on relays & a fuse block, just have not seen a 6 bank relay block with the connector but not have all the extra wire, as for the fuse block I'd like one that you make eack fuse hot and not one that they are all hot when you turn on a master switch. and the plumbing, because this is my 1st build I just don't know what all I need. it will work out, just hope it turns out looking good and is neat.
sorry I know you guys hate long post. but I have lots more if you would like to hear it and can get past spelling and wordage used.