I'm running 2 "p" pumps paralell with check valves then all kinds of hoses and elbows....I'm sure I'll be into at least $500 in hose and fitiings
It should be fun having 4 tires capable of turning over 50 degresseach all with individual cutting brakes ans air lockers.......I'm going to get all confused for a while driving.
It should be fun having 4 tires capable of turning over 50 degresseach all with individual cutting brakes ans air lockers.......I'm going to get all confused for a while driving.
Last edited: