Lincolnlock
Well-Known Member
No more time for screwing around... I've got 4 more weeks before jeep safari to get this thing done. Lowered 6inchs, lengthened 6inchs, boatsides installed, engine and transmssion in. I'll post up progress as I go. I've been working on this 8 days so far. I'll post a before picture.
Last edited: