Headed up to Sam's tonight and snapped a few pics. I was hoping to be able to work some on it, but I couldn't make it up to Marysville until later in the evening. As soon as I walked in the garage, I found that Sam has been a busy boy 
Tie rod made, inserts welded, installed, and rather beefy...

Can you say 1 3/4" 3/8" wall DOM:gunsmilie:

The mounting tabs for the hydro aren't exactly small either

Orbital is in and mated to the steering wheel

Stock rear hangers cut off and these guys in their place, soon to be boxed in. We're going for minimized hang-up spots underneath...

And I just LOVE the way the front hangers turned out! Hole sawed through frame, sleeved with 1/4" DOM, 1/4" plate on inside rail, hanger on outside, bolt through all. They just look sweet

Weif sat in the jeep the whole time, mentally preparing for all the fun we're gonna have when this thing's done 



Next up is getting the 4:1s so we can tear into the 300 and clock it... :clappy: