• Help Support Hardline Crawlers :

Reply to thread

Tossed the front end back under it



Welded the lower link mounts on the rear axle



Got the basic backhalf structure layed out, obviously still have a bunch more tube to add. The open tube is for a swaybar



Started on the upper link mounts



Here's my $180 box of packing peanuts. It was supposed to be tie rods and heim joints. Thanks USPS :mad::mad:



Back
Top