Wow no wonder nothing gets done


Here is some production numbers

If we build roads a road 10ft wide with 1 ft of rock is .37 yds of material per ft

Or 1 yd of material per 3 ft of road

A track dump can haul 8 yds of material or 27 ft of road per load

At a load interval of 1 load every 5 minutes or 320 ft per hour or  2560 ft per day

With delays in trucking of material to the job site and breakdowns I figure 2 miles a week


So on my math that is 4 weeks for 8 miles of base

But all of the trail doesn