Well, I got my fittings last week sometime, and got the fuel cell plumbed in. I need to pick up some hose for the vent still, but it's ready to run. (and did) :cheer:
Block off for the unused port, and the vent fittings.
Pressure and return plumbed in, with a pre-pump filter.
Then I got back to work on the mount. I cut out the top plate and had to cut the top two tabs off and reweld them on to get a nice tight fit. I got the first bend of an "S" done, and realized I didn't have a way to make the second.
Oh well, it turned out alright in the end, I think.
I used a couple pieces of rectangle tubing for risers, and the only thing left is some L brackets to mount it to the floor/hold the cell front to back. The brackets will extend up on either side to keep the cell snug on all sides.
And I've got some of this.... ummm stuff to pad between the cell and mount.
It's 3m and has double back on it.. I think sometime they were wanting us to use it for bumper repair backer, but it never caught on. But nevertheless, it's perfect for the task at hand. :redneck:
I probably would have gotten more done, but I was busy saturday doing this.
(click for vid)