Eddyj
Well-Known Member
We play around central Missouri for fair season, next 3 months then I'll make my way to West Tn then Alabama.
If my guys haven't had an extremely busy, hot, long Saturday we usually have everything ready to pull out in 4 hours after closing. If my guys had a long day we will work for about 2 hours and get everything done that needs generator power done then call it a night, finish it the next day.
As far as set up goes it's hard to judge because we are also in the process of moving the equipment, so pieces are showing up at different times. But usually a full day if not a day and a half to set up. Setup is a lot move involved due to inspecting the equipment and leveling.
If my guys haven't had an extremely busy, hot, long Saturday we usually have everything ready to pull out in 4 hours after closing. If my guys had a long day we will work for about 2 hours and get everything done that needs generator power done then call it a night, finish it the next day.
As far as set up goes it's hard to judge because we are also in the process of moving the equipment, so pieces are showing up at different times. But usually a full day if not a day and a half to set up. Setup is a lot move involved due to inspecting the equipment and leveling.