64FJ40
Well-Known Member
The 5' version spans far enough, it might be doable, but that all depends on what they say the setbacks must be.
Definitely something to gauge the price on with everything else and keep in the back pocket as a solution.
You said DNR was requiring a bridge?
Can you get away with a bottomless arched culvert? We've done them anywhere from 6' to 18' bottom width. The sections bolt together, and are a LOT lighter to lift into place than prefab concrete panels.
