Trailer is coming along quickly! should be sleepable and showerable by the weekend. Then once I get done with the front I will concentrate on the stacker portion of the trailer. I'm tired.
It's is pepper.gif I'll post more pic's on pirate sunday evening after that days work is done. Three rigs on the bottom and drive up two over the top, axle's will just clear the tops of the three on bottom.
The caddy buggy will go to all XRRA events, with them being two day events if the single seater brakes down and can't fix it, just roll out the caddy for day two of racing