I had about an hour in the shop this morning before work. I got the old axle pulled out and sat the new housing back in its place. It's ready to start mocking up link and shock mounts.
I spent a few hours in the shop today before coming in for night shift. I got the axle squared up under the buggy and got the lower link and shock mounts tacked on. They're snug, but as long as the link bolt on the passenger side will clear the 3rd it will be fine.
I used a piece of flat bar bolted to the link bracket to get them at the same height.
The upper link and the panhard bar are sitting where they need to be I just have to build the mounts for them. I started on a little Cinnamon Toast Crunch CAD but can out of time.