Well I havent done much but heres a little update. I have moved the motor back, didnt get as much as i wanted, only 5 inches. have all new drivetrain mounts. The 205 is twin-sticked. Now i am starting on the tubework for the floor and firewall.
Negative, one of my friends bought it, he was over putting some new shock hoops we made on the front and had the front tires off so i rolled them up by my rig.
Im getting closer and closer to wheeling time. My floor pans are fully welded/bolted in and my seat plate/mounts are fully welded in. All seatbelt tabs are welded on. Worked today on closing the cab in, have the back wall all in place. My tranny is in being rebuilt, so when that get here I can work on my tranny tunnel.
WOW:masturbanana[1]: its hard to believe that was once a toyota like mine:haha: That is just awesome!!! IF you ever sell it let me know that thing is Too WICKED:FIREdevil: You have done an amzing job!!:awesomework: keep the pics coming!! :beer:
Got quite a bit done yesterday. Pulled the motor out to finish the firewall, run new brake lines and plate the top of my motor mounts. Got another section above the dash are plated in and also my windshield supports welded in. then I put the motor, tranny and tcase back in. I also added some new trail gear front shackles.
well working nights and sleeping in the day I try to get one thing done a day on the rig, so today was mounting the mixer for the propane system. Used to have it mounted on top of my old shock hoops, This time I mounted it to the engine block in about the same spot so all hoses could be the same.