When do you have to have all the work done by Mark? Are you gonna have it done for the 18th work party?
I belive this is the goal if posible.
When do you have to have all the work done by Mark? Are you gonna have it done for the 18th work party?
watcha gonna do about them rear air shocks? i'd be worried they won't handle the constant load.
just curious.
Nice work Mark. :awesomework: Anything you still need?
When do you have to have all the work done by Mark? Are you gonna have it done for the 18th work party?
Is there enough room to put the winch down by the tank. It would lower the center of gravity for winching and.....
The only load the air shocks will see, is the same load they see during normal winching duty.
I will be lifting (and holding for a duration) nothing. My design (your interpretation of it) aside, the log will rarely leave the ground.
The rear winch will drag the log, along with help from the skidder plate.
The skidder plate will be chain connected to the rear axle. The log will be hauled with connection to the rear axle.......no stress on the air shocks.
hmmm looks interesting. I don't want to be packing a large steel plate around
D-rings, chains, log chockers.